Original file can be found here.

 

Combined Notice of Finding of No Significant Impact and

Notice of Intent to Request a Release of Funds

 

                  ---------------------------------------------------------------------

 

NOTICE OF FINDING OF NO SIGNFICANT IMPACT AND
NOTICE OF INTENT TO REQUEST RELEASE OF FUNDS

11/25/2019 

Colleton County

PO Box 157

Walterboro, SC 29488

(843) 549-5221

  

These notices shall satisfy two separate but related procedural requirements for activities to be undertaken by Colleton County.

REQUEST FOR RELEASE OF FUNDS 

On or about December 16, 2019, Colleton County will submit a request to the SC Department of Commerce/Grants Administration Division for the release of CDBG funds under Title I of the Housing and Community Development Act of 1974, as amended, to undertake a project known as the Colleton County Project with a total of $550,000 including $500,000 CDBG funds where the County proposes to use funding to upgrade the water lines in the identified neighborhood. The primary activity with this project is to replace the old, small water lines with larger water lines and add fire hydrants. Approximately 7,001 LF of new 6” water line will replace the existing small water line to connect the water line to provide a looping effect and improve water pressure and flow to allow for installing fire hydrants to cover the area with better fire protection. Additionally, the project will include the installation of 5 new fire hydrants, 12 new gate valves, replacement of all service assemblies, and looped interconnections to an existing 12-inch water main, an existing 8-inch water main, and an existing 6-inch water main.  The looping improves flow capabilities, reduces pressure losses, and helps to maintain fresh water.

 

Proposed 6-inch water main along Live Oak Street will cross wetlands depicted on the USFWS National Wetlands Inventory Maps beginning approximately 1,135 south of Live Oak Street’s intersection with Barracada Road.  The crossing is proposed to be made by the directional drill method using fused HDPE pipe extending approximately 300 feet southward in a manner such that there will be no impacts to these wetlands.  Both the entry point and the exit point will be positioned outside the boundaries of the wetlands.  Directional drilling of utility pipelines has now advanced to the point that such wetlands crossings need not be designed with one continuous arc but rather can be turned as needed to extend under streams and associated wetlands such as Shereau Branch without having to go excessively deep.  This will allow the design to proceed such that there will be a minimum of 4 feet of earth cover, but not so deep that access is restricted if a leak or rupture were to occur.  A wetlands crossing in this manner would be allowed by the US Army Corps of Engineers Nationwide Permit #12-Utility Line Activities and would not require the submittal of a Pre-Construction Notification.

Since there are no wetlands within the right-of-way of Barracada Road and the water mainalong that road is proposed to be completely within that right-of-way, there will be no water mains crossing wetlands along that road.

The design of the proposed project will incorporate the use of Best Management Practices (BMP’s) particularly as it relates to sediment/erosion control and the protection of the wetlands to be crossed.

 

FINDING OF NO SIGNIFICANT IMPACT

Colleton County has determined that the project will have no significant impact on the human environment.  Therefore, an Environmental Impact Statement under the National Environmental Policy Act of 1969 (NEPA) is not required.  Additional project information is contained in the Environmental Review Record (ERR) on file at Colleton County Administration Office, 109 Benson Street, Walterboro, SC and may be examined or copied weekdays 9A.M to 5P.M.

Edisto River: Black Water Crown Jewel

August 24, 2019
Saturday, August 24, 2019 - 1:00pm to 2:00pm
Join us for a in depth, first-hand look at the Edisto River. The Edisto River, the longest free-flowing black water river in North America, is one of the most important rivers in the world, a force of life for the Atlantic Ocean. The river is entirely contained in South Carolina and is under threat. Susan spent eight years in the making of “Edisto River: Black Water Crown Jewel,” working with nature photographer Larry Price and co-author Rosie Price. The making of the book, a winner of seven national awards, was a journey of its own, an experience that profoundly changed the lives of the three people who created the book.

Susan Kammeraad-Campbell is the publisher and editor in chief of Joggling Board Press and creator and producer of Storyboard America, a podcast being piloted in South Carolina in partnership with S.C. Public Radio. She is the author of “Edisto River: Black Water Crown Jewel,” winner of seven national awards, and “Doc: The Story of Dennis Littky,” which became an NBC movie of the week called “A Town Torn Apart.” She has served as lead editor of 34 books, many of which have won multiple literary and design awards. Joggling Board Press is a teaching press, and, over the years, Susan has mentored more than 30 interns and apprentices.

Share this Event

Location:
Colleton Museum & Farmers Market
506 E Washington St, Walterboro, SC 29488
https://www.facebook.com/events/485839798622199/